Skip to product information
1 of 3

Yokogawa SSB401-53 S9343FA Connector Unit

Yokogawa SSB401-53 S9343FA Connector Unit

The Yokogawa SSB401-53 S9343FA, also cataloged as the SSB401-53 Connector Unit, serves as the primary SSB401 Connector Unit utilized to execute ESB bus communication across Yokogawa Field Control Unit (FCU)...

17 people are viewing this right now

AvailabilityIn stock

SKU: SSB401-53 S9343FA
Vendor: Yokogawa
Category: Connector Unit
Related Series:

Shipping & Returns

Reliable Worldwide Delivery

  • Carriers: Shipped via DHL, FedEx, UPS, or USPS.
  • Dispatch: Orders processed in 1-2 business days and dispatched within 3-5 business days.
  • Tracking: Full tracking details provided via email upon shipment.

30-Day Money-Back Guarantee

  • Guarantee: 30-day return window for in-stock, factory-sealed products.
  • Condition: Items must be unopened, unused, and in original packaging.
  • Authenticity: We guarantee 100% original and authentic hardware.

Need more details? Read our fullShipping PolicyandRefund Policy.

Authenticity & Warranty

  • Genuine Guarantee: We supply only 100% original, brand-new, and factory-sealed industrial automation parts.
  • Full Coverage: Every component is backed by a 12-month comprehensive warranty from the date of purchase.
  • Traceability: All products come with original factory documentation and accessories for full industrial compliance.

Technical Support & Sourcing

  • Expert Assistance: Our technical team provides free consultation to help you verify compatibility for DCS and PLC systems.
  • Rare Part Sourcing: Specializing in obsolete and hard-to-find components from Allen-Bradley, Siemens, ABB, HIMA, and more.
  • Bulk Inquiries: Contact us at pambo@5gplc.com for volume pricing or customized project quotes.
View full product details

The Yokogawa SSB401-53 S9343FA, also cataloged as the SSB401-53 Connector Unit, serves as the primary SSB401 Connector Unit utilized to execute ESB bus communication across Yokogawa Field Control Unit (FCU) platforms.

Hardware Specifications

Parameter Specification
Model SSB401-53 S9343FA
Brand Yokogawa
Origin Japan
Weight 0.3
Dimensions 19-inch rack compatible
Operating Temp -20 deg C to +70 deg C
Power Consumption 120 W (100–120 V AC) / 230 W (220–240 V AC) / 5.5 A (24 V DC)
Input Voltage 100–120 V AC, 220–240 V AC, or 24 V DC

Process Control Connectivity and Signal Isolation

The SSB401-53 facilitates data exchange between field instrumentation and the FCU via the ESB bus. The unit is engineered to maintain high signal integrity by employing channel-to-channel isolation, which mitigates the impact of potential ground loops and electromagnetic interference within the control cabinet. During operation, the module ensures deterministic communication timing, essential for real-time process control applications. It also features internal diagnostics for monitoring bus traffic, providing status feedback to the control system to detect communication latency or physical layer degradation.

Frequently Asked Questions

Q: Can this unit handle redundant power supply inputs?

A: The SSB401-53 is designed to accommodate the specified voltage ranges. When configured in a redundant power architecture, ensure that both power sources are phase-synchronized and within the defined voltage tolerances to prevent supply-side conflict.

Q: Is the ESB bus termination handled internally?

A: Yes, the unit includes active bus termination circuitry to prevent signal reflection at the end of the ESB bus segment. Ensure the unit is positioned according to the network topology map to maintain proper impedance matching.

Field Installation Guidelines

  • Ensure the 19-inch rack assembly is properly bonded to the system safety ground before mounting the SSB401-53 to prevent potential chassis potential differences.
  • Verify the input voltage selector or external supply source matches the specific unit rating (AC or DC) prior to energization.
  • Route ESB bus cabling away from high-current power conductors to reduce induced noise, adhering to a minimum separation distance as defined in the site electrical installation standards.
  • Secure all rack-mounting screws firmly to ensure the chassis maintains low-resistance contact with the rack frame, which is critical for shielding effectiveness.
  • Post-installation, perform a bus integrity check using the system engineering workstation to confirm that all node communication packets are within the expected transmission latency limits.